(720) 555-0114
Roof replacement

A new roof in one to two days. Properly.

Full tear-off, new underlayment and flashing, architectural or Class 4 impact-resistant shingles — with your landscaping protected before the first shingle comes off and a magnetic nail sweep before we leave.

Day of build

What a build day looks like.

Materials land the day before or the morning of. Tarps and plywood protect beds, siding, and AC units. Tear-off goes to a trailer, not your lawn.

Deck inspection happens with the old roof off — soft or split decking gets replaced and photographed before anything covers it. Then ice-and-water shield at eaves and valleys, synthetic underlayment, drip edge, new flashing and boots, shingles, ridge vent, ridge caps.

Cleanup is part of the job: full site sweep, magnetic roller for nails, and final photos of the finished system, top to bottom.

Roofer fastening an impact-resistant shingle course on a roof deck
Choices that matter here

Spec it for hail country.

Financing & the claim

Storm replacements are often largely insurer-funded beyond your deductible; for planned replacements we walk you through payment options up front — labeled clearly, no surprises mid-job.

Class 4 shingles

Highest impact rating made (UL 2218). The Front Range upgrade that can pay back through insurer premium discounts — confirm yours with your agent.

Ventilation done right

Balanced intake and exhaust extends shingle life and keeps attics from cooking — we calculate it, not eyeball it.

The water path

New gutters, downspouts, and drip edge with the roof means the whole drainage system starts at year zero together.

Want the honest read on your roof's last years?

Free inspection first
Call nowFree inspection